Construction of two photovoltaic plants
Altenia has built two high-efficiency photovoltaic systems equipped with trackers for Reden Solar Italy
The customer's request: two photovoltaic plants in Montenero di Bisaccia
Reden Solar Italy, part of Reden Group, an independent producer of photovoltaic electricity active in Europe, Central and Latin America, has commissioned Altenia to build two new photovoltaic plants in Montenero di Bisaccia (CB).
The solution by Altenia: tracker plants and grid connection works
The plants, respectively of 6.15 MWp and 7.9 MWp, are equipped with tracker systems that guarantee the maximization of energy production by automatically adjusting the inclination of the solar panels. These are two particularly challenging projects: Montenero 1 required the installation of elevated electrical substations to comply with landscape and water constraints, while Montenero 2 provided particularly complex grid connection solutions. In addition to the design of the grid connection works, Altenia is also responsible for the operational management and maintenance of the two plants.
The value of the project: production maximized and O&M in place
This project once again confirms Altenia's high expertise in the photovoltaic sector and its ability to address complex technical challenges with innovative solutions.